Dec
18
SIP installation complete
Installation of the Timber SIP frame in Ripon is complete. Clays LLP from Skipton fabricated and then erected the panels in under 3-weeks. The house is wrapped in a breather membrane and ready for the brickwork to commence.

The dark breather membrane blends the house into the backdrop of trees.

Internal rooms are vaulted maximising the light and space